General contractor in Oakland, Piedmont and Berkeley
Additions, structural and seismic work, remodels and stair rebuilds, with the permitting each city requires.
We are based in Richmond and work across Oakland, Piedmont and Berkeley. Each city has its own building department, its own review process, and its own rules for older houses and hillside lots. Below is what tends to come up here, and how it affects a project.

CSLB 1063290
Licensed and insured
Tell us about your project
We will get back to you as soon as possible.
Please try again later.
What houses here tend to need
Older foundations and framing
Many older houses here were framed in redwood and Douglas fir, with few foundation bolts and no plywood on the cripple walls. Craftsman houses from the 1930s and 1940s often need new foundations, grade beams and seismic upgrades before anything else.
Exterior stairs on hillside lots
In the Oakland hills, the stairs are often the main access to the house. Where a stair meets the building, the waterproofing fails, the framing beneath rots, and termites follow.
Water damage behind stucco
Stucco gives no outward sign of rot. On a job in Piedmont, opening one wall showed that termites and rot had removed every piece of framing inside it.
Permits and local rules
Design review in Oakland
Additions and alterations to one- and two-unit houses often go through Small Project Design Review, a streamlined process that Planning staff can approve without a hearing. An upper-story addition of more than 250 square feet is also reviewed for its effect on neighbors' views, privacy and sunlight.
Design review in Piedmont
Many projects need a design review permit before a building permit, at expedited, director or Planning Commission level. Interior remodeling with no exterior changes and no new bedrooms, and exact like-for-like repair, generally do not. Applications go through the city's eTRAKiT system.
Hillside fire zones
Much of the Oakland and Berkeley hills falls in Very High Fire Hazard Severity Zones. New buildings, additions and major remodels there are built to Chapter 7A of the California Building Code: a Class A roof, ember-resistant vents, tempered glazing, and ignition-resistant siding and decking.
Soft story programs
Oakland and Berkeley both require retrofits of soft story buildings with five or more units. Single-family homes are not covered, so for most homeowners a retrofit is voluntary, unless a remodel or addition triggers one through the permit.
ADUs in Oakland
Oakland publishes pre-approved ADU plans. They are pre-approved rather than pre-permitted, so a site-specific permit is still required, and a contractor still has to look at where your electric, sewer and water are. We can get the plans for you.
Construction debris
Oakland and Piedmont require debris to go through a certified recycling and waste management company, tracked through Green Halo.
Services most asked for here
New foundations, grade beams and seismic upgrades for older houses.
Finding and repairing water damage behind stucco and under stairs. Exterior and masonry stair rebuilds, roofline extensions and trim.
Nearby work
Crocker Highlands, Oakland
A bedroom, bathroom and laundry addition for an architect on his own 1941 house.
Piedmont
Roughly 90 linear feet of failed foundation replaced beneath a standing house, for Robert Kennedy Construction.
Montclair, Oakland
A brick stair rebuilt with a terracotta tile layup, after the waterproofing and framing had failed.
I am an architect and was connected to Johnny by a mutual structural engineer colleague. I hired Johnny to do a modest renovation to my house in Oakland in 2022/23. Johnny and his team completed our project on time and worked with me to efficiently address unforeseen conditions in our 1941 house along the way. As an architect, I had a few fussy design details that I cared about and the caliber team pulled them off.
Jeffrey LaBoskey, award-winning Bay Area architect
Review of Caliber Construction, now Oak & Iron Buildworks
Questions we hear
Does my Piedmont remodel need design review?
Often, yes. Interior remodeling with no exterior changes and no new bedrooms, and exact like-for-like repair, generally do not. Additions and most exterior changes go through design review before a building permit is issued.
Is a seismic retrofit required for my house?
For most single-family homes, no. The mandatory programs in Oakland and Berkeley cover buildings with five or more units. A remodel or addition can trigger a seismic upgrade through the permit, depending on its cost or size.
Is my house in a fire zone?
Check the CAL FIRE hazard map or the city's own map before design. If it is, the exterior of an addition or major remodel is built to Chapter 7A, and the materials need to be chosen with that in mind from the start.
Building in Oakland, Piedmont or Berkeley?
You do not need plans, a permit or a finished idea to start a conversation.








