Taking a Potrero Hill Duplex Back to Its Structure
Reading time: about 7 minutes
TLDR
- A duplex of about 2,800 square feet on Vermont Street, taken back to its structure and rebuilt with a new third floor over a little more than 12 months.
- Before any demolition, the finishes and fixtures the owners wanted to keep were removed and stored, including the original five-panel Victorian doors.
- A pair of walk-on skylights from England carries daylight from the garden roof down through the third floor and into a kitchen with no windows of its own.
- Changing the garden roof from unoccupied to occupied during construction triggered a fire sprinkler system and a new water service.
On Vermont Street, on top of Potrero Hill in San Francisco, a young couple whose son was a year or two old when the project started brought us in to remodel their duplex. The house runs to about 2,800 square feet, and our scope ran a little over 12 months.
We were initially brought in for the preparation work, the structural work, the demolition, and the concrete and framing. From there, the clients asked us to take on the electrical, plumbing and HVAC, and on into the finishes. We did the insulation, the drywall and the flooring, the trim carpentry for the doors and baseboards, the exterior siding, the windows and doors, the roofing and the exterior painting. The clients took on the installation of the kitchen themselves.
The house as we found it
The ground floor held an in-law unit on one side, which the clients used for a live-in nanny, with two bedrooms, a bathroom, a kitchenette and a living room at the back. A single-space garage sat on the other side. The arrangement is very common in San Francisco: a garage on one side of the lower level and a self-contained unit on the other.
The lower part of the house is Victorian, with 10-foot ceilings on the second floor. At the back of the top of the building there was a small addition, a kind of third floor that really was not much to speak of.
Saving what was worth keeping
Before any demolition, we coordinated with the homeowners on the finishes and fixtures they wanted to save. We removed them and put them into storage, so they would be kept safe until after the project.
The original doors were five-panel Victorian doors. The clients wanted to keep the Victorian style, so we saved the doors, put new jambs on them and rehung them at the end of the project.
Structure for a new floor
Demolition started on the ground floor, to allow room for the structural upgrades. New steel, new framing members and new concrete went in on the ground floor to support the additional story on top of the building. On the elevations, the house was demolished down to a line, and everything at the back above that line, including the pop-out and the roof structure, is new construction.
The second floor footprint changed as well, and some interior walls moved to suit the owners' new layout. The biggest change was the stairs. The original stair wound up the back of the property from the ground floor all the way to the top, and the front floors were reached from the street by their own stairs. In the new layout, a stair runs from the street to the second floor, and a second set runs straight in from the entrance up to the third floor. The back stairwell still serves the ground and first floors, changed only slightly.
The new third floor
The new top floor has a primary bedroom at the back with a walk-in closet and a primary bath, a new laundry with a stackable washer and dryer, two guest bedrooms, and a hall bath with its own shower. The lower floors have 10-foot ceilings, so we wanted as much as possible to mirror that height in the new floor.
A light well through two floors
The kitchen was closed in. With a property on either side, it had no windows of its own. The closest windows were the breakfast nook at the back of the house and the dining room windows at the front.
The architect's idea was an inset walk-on skylight in the floor of the third floor, at the top of the stairs, mirrored by a second skylight in the flat roof directly above it. Together they act as a light well, carrying daylight from the roof down through the third floor and into the kitchen, just beside the stove.
We could not find a company in America making structural walk-on skylights, so the units came from Glazing Vision in England. They were very strong, structurally very sound and very heavy, and we brought in a crane to get them into position on the roof. The skylights over the dining room table are standard curb-mounted Velux units.
The garden roof
The flat roof at the top of the building is a garden roof. It was finished with a Kemper roofing membrane, a liquid-applied product with a polyester underlayment and a long warranty. The clients specifically wanted the Kemper system, so we found a roofing contractor with experience installing it, and they were very professional. It was the first time Johnny had used the product.
A stainless steel handrail runs around the roof to make it safe. From the top of Potrero Hill, on a good day, the views run all the way to downtown, across to the Dogpatch and back over to Twin Peaks, with the whole skyline right there.
The back roof area, over the primary bedroom and its bathroom, is a service roof, and the condensers for the HVAC units sit up there.
Keeping the ceilings high
The clients wanted high ceilings and open-plan space, so we put a lot of effort into concealing the ducting. On the second floor, the unit for the HVAC system sits in a drop ceiling in the bathroom, and serves the game room, the living room, the breakfast nook and the bathroom.
The fan coil for the second floor living area and the third floor sits in the A-frame roof at the front of the property. We ran its ducting through the A-frame roof along the roof joists, punched through the wall at the top of the curb for the flat roof, ran it along that roof, and brought it back in through the roofing envelope above the primary bedroom. That way the living area did not lose any ceiling height.
Service and permit changes
There was a significant amount of electrical work. We put in a new 200-amp service off the street, coordinating with PG&E, who had to upgrade the nearest transformer to a higher capacity to carry it.
The garden roof was initially supposed to be unoccupied, used only for servicing, not a place to spend time. During construction, the clients changed the permit for the roof from unoccupied to occupied, so they could use it as a space to hang out. That change triggered a requirement for a fire sprinkler system throughout the building. A specialist subcontractor came on to design the system, and because there was not enough water coming into the property to supply it, the water service at the front had to be upgraded. We coordinated with the San Francisco Water Department, the city and the fire department to get it through.
The envelope
Once the roofing was done, we installed all the windows and doors ourselves and did all the exterior waterproofing. The siding is a 1x10 cove siding to match the existing, and the windows are Andersen 400 Series double-glazed units.
Finishes
Inside, the windows have a drywall return rather than trim. The drywall wraps around the corner and butts to the window frame. It takes a little more time at the drywall stage, adjusting the furring strips to hold an even reveal on each side, but it gives a nice, clean, modern finish, and it saves the cost of the finished trim. It also helps where space is tight. Casing usually needs a minimum of about 3 1/2 inches on either side of a window, while a drywall return needs only the 5/8 clearance for the drywall, so in a tight corner the window opening can be as large as possible.
After the insulation, the roofing and the electrical, HVAC and plumbing rough-in, the drywall and tiling subcontractors came in. The tilers put the waterproofing membranes into the showers, and the pans were tested and signed off by the city before any tile was set.
The clients selected the tiles and the layout, and kept it straightforward. They wanted consistency throughout: slate on the floors, and a medium-format white tile at 12 by 24 inches on the bathroom walls and shower enclosures.
What the project took
By the time our scope was through, the project had run a little over 12 months. It was a lot, with the structural work, the new floor, the imported skylights, the service upgrade, and the sprinkler system and water service brought on partway through, but we got through it, and it was a great project to take on.
If you're looking for a competent contractor who, most importantly, is completely trustworthy and honest, look no further than Johnny at Caliber. Johnny and his crew did an outstanding job for our renovation projects. My only regret is that I don't have more properties for Johnny to renovate for me.
P.K.
Review of Caliber Construction, now Oak & Iron Buildworks