Foundations, Framing & Seismic Retrofitting
Foundations, framing, steel, shear walls and seismic upgrades, priced and built from a structural engineer's drawings.
How structural work comes up
Structural work usually arrives attached to something else you want to do:
A voluntary upgrade. The foundations in your crawl space or garage do not have enough foundation bolts, and the walls have no plywood bracing, so you decide the house would benefit from a seismic upgrade.
A remodel. You want the kitchen and dining room to be one room, and the wall between them is load-bearing.
An addition. Building out or up can be large enough, in cost or square footage, to trigger a seismic upgrade as part of the permit.
General contractors also bring us in for foundations, framing and steel on their own projects.
5.0-Star Average
Google & Yelp

Fully Licensed and Insured
CSLB 1063290
Tell us about your project
We will get back to you as soon as possible.
Please try again later.
Foundations and concrete
We do our own concrete work: excavation, forming, rebar and pouring. That includes footings, foundations, piers, grade beams, retaining walls, slabs and flatwork, and architectural concrete where the finish will be seen.
When a foundation is beginning to fail, underpinning can reinforce what is there. When a building has already moved, we shore the existing loads, jack the floor structure back up and level it before new foundation work goes in.
In Piedmont, working for Robert Kennedy Construction, we replaced roughly 90 linear feet of failed foundation beneath a standing house. The engineer's drawings called for 16-inch piers drilled 16 feet into the ground. With no room for the drill rig under the house, the piers were offset and connected back to the foundation with corbels 2 feet square by 18 inches deep.
16-inch piers drilled 16 feet into the ground.
Contractor Jonathan Croke of Caliber Construction performed very well on a kitchen floor leveling operation. His crew exceeded my specifications for this job whilst keeping to budget. This was not a simple job. We'll have Jonny back for follow-up work.
M Bobbitt
Yelp Review of Caliber Construction, now Oak & Iron Buildworks

Framing, steel and moment frames
The most common structural request on a remodel is removing a wall that is holding something up. The load it carried has to travel somewhere else, and the engineer designs a path for it.
Most load transfer is done in engineered lumber: LVLs and PSLs, such as Parallam. Past a certain span, often around 30 feet, the beam a job needs becomes impractically large, and the engineer specifies steel. A steel beam is packed out with wood on the sides so framing can attach to it. Our own team does site welding, and we work with fabricators on heavier structural steel.
A moment frame is a header carried on two legs, with engineered connections and a foundation sized to take the load. Moment frames come up most in soft story conditions, such as living space over a garage, where there is not enough solid wall for a shear wall.
Seismic retrofits
A seismic retrofit connects a house properly to its foundation and gives the lower level enough strength to resist lateral movement.
On a first look at a crawl space or garage, we check how many foundation bolts there are, whether the walls have any shear nailing or plywood, how the cripple walls are built, and whether there are hold-downs from any earlier seismic work. We also look for cracking in the foundation, signs of a French drain or waterproofing, and any framing that shows moisture, rot or termite damage.
Why a remodel is the time to do it
When you remodel, the finishes come off and the structure is exposed, which is the opportunity to reinforce it. Seismic requirements are revised regularly and have generally tightened over time. The 2025 California Building Code, which took effect in 2026, brought in updated seismic design standards, so what an engineer specifies depends on when your permit goes in.
Cripple wall bracing. The short stud wall between the foundation and the first floor, sheathed in structural plywood and nailed to the engineer's schedule.
Foundation bolting. Anchors drilled and epoxied into the existing foundation, tying the sill plate to the concrete.
Shear walls and hold downs. Shear walls resist lateral force along a wall, and hold downs stop its ends from lifting.
San Francisco, Oakland and Berkeley run mandatory soft story retrofit programs for multi-unit residential buildings. For most single-family homes, a retrofit is voluntary unless a remodel or addition triggers one through the permit.
How the work is priced
Structural work is priced from engineered drawings, not from a walkthrough. If there is no engineer on the project yet, we bring one in. The engineer looks at the loads, works out how best to support them, and produces a set of drawings. We price the materials and labor from those drawings and give you an estimate.
You can engage us for the structural scope alone, with another contractor handling the remodel around it, or for the whole project, through to final sign-off on the job card.
Bringing us in on your project?
If your project needs foundations, framing, steel or other structural work, send us the drawings and we will price it.

Frequently Asked Questions
Is a seismic retrofit required for my house?
For most single-family homes, no. The mandatory soft-story programs cover multi-unit buildings. A remodel or addition can trigger a seismic upgrade through the permit, depending on its cost or size, and the engineer's drawings will set out what is required.
Can you do only the structural work, with another contractor on the remodel?
Yes. We can take the structural scope on its own, priced from the engineer's drawings, with your contractor handling the remodel around it.
Do you need an engineer before you can price the work?
Yes. Structural work is priced from engineered drawings. If there is no engineer on the project yet, we bring one in.