<?xml version="1.0" encoding="UTF-8"?>
<rss xmlns:atom="http://www.w3.org/2005/Atom" xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:g-custom="http://base.google.com/cns/1.0" xmlns:media="http://search.yahoo.com/mrss/" version="2.0">
  <channel>
    <title>oakironbuildworks</title>
    <link>https://www.oakironbuildworks.com</link>
    <description />
    <atom:link href="https://www.oakironbuildworks.com/feed/rss2" type="application/rss+xml" rel="self" />
    <item>
      <title>What Home Inspections Miss in Older Bay Area Houses</title>
      <link>https://www.oakironbuildworks.com/what-home-inspections-miss</link>
      <description>Why water damage and rot in older Bay Area houses go unnoticed, where they start, and what happens when a remodel opens up a wall that was hollow.</description>
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Reading time: about 6 minutes
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          TLDR
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;ul&gt;&#xD;
    &lt;li&gt;
          A home inspection is usually required for a sale, but it often does not catch half of what is there, especially rot and water intrusion behind stucco.
         &lt;/li&gt;&#xD;
    &lt;li&gt;
          Damage tends to start where interior and exterior meet: decks, roof decks, guardrail posts, ledgers and windows.
         &lt;/li&gt;&#xD;
    &lt;li&gt;
          A small leak can run for years without showing inside, but leave enough moisture to grow fungus. If wood is wet and cannot dry, it is going to rot.
         &lt;/li&gt;&#xD;
    &lt;li&gt;
          On a complex, higher-end property, a waterproofing consultant's plan gives you a fix and a record you can hand to the next owner.
         &lt;/li&gt;&#xD;
  &lt;/ul&gt;&#xD;
  &lt;p&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Because of the materials older Bay Area buildings are made of, there are limits to what they are capable of. Practices and materials were not always right at the time, and even when they were, decades of time and earthquakes take their toll. Stuff moves, cracks open, and water gets in. Pipes leak and roofs leak. People also have different tolerances for what they are willing to accept, and some owners, landlords in particular, will let a roof leak for years and years and just let it go.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          Where the problems come from
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          In our experience, it shows up most in a house that was owned by an older couple who were not doing regular maintenance. The house then gets passed on through inheritance, or sold within the family.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          There is also a lot of turnover in property in the Bay Area. With property values where they are, it often makes sense for owners to sell. A new owner buys a house and, a couple of years in, finds problems they are now on the hook for, problems they inherited and did not know about. Work done on a house just before a sale can be part of the cause. If it was done to make the house look nicer for the sale rather than done properly, it can create the conditions for a problem that presents itself four or seven years down the line.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          On one job in El Cerrito, the owners had inherited the house from their parents, and no maintenance had been done for 15 years or more. Water had been getting in around a window at the front of the house, where the concrete stairs met the front wall, and running down the framing on the inside. The framing under the stairs and under the window was gone. You could pull it out with your hand.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          What an inspection does not catch
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          A home inspection is usually a requirement for a sale to happen. But a lot of the time, inspections do not catch half of what is there. Rot and water intrusion are hard to see, and stucco in particular makes them invisible. There is no way you can tell from the outside.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Wood siding is easier to read. There are telltale signs: nails that have popped, and sometimes siding that has rotted away or warped because water is getting in behind it. With stucco, there is nothing to see until the stucco comes off.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          Where water gets in
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Some of the most problematic details are where exterior and interior spaces meet: the transitions between living space and decks, balconies, roof decks and the facade.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          A roof deck with living space below it is a common source of trouble, especially where there are surface drains, or penetrations through the roofing layup. Handrails and guardrails are often attached with posts screwed or drilled down into the framing through the roofing substrate, and sealed with caulking or silicone. Over time the sealant shrinks and cracks, and water gets in.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Deck ledgers are another. The older way of attaching a ledger was to screw it straight onto the siding, with no spacers. There is no room for water to pass down behind it, so water gets trapped, there is no airflow, and the wood stays damp.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          A small leak often does not present inside the house at all. It can seep down through the framing for years, never enough to show, but always enough to keep the wood wet and promote fungal growth. Then one day enough happens that it starts to present inside, the walls get opened up, and the damage is far larger than anyone expected.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          A good rule of thumb: if there is water there and it cannot dry, it is going to rot. Rot then attracts termites, and once framing goes soft, the loads stop carrying, the stucco and plaster crack, and the house starts to settle and shift.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div&gt;&#xD;
  &lt;img src="https://irp.cdn-website.com/6442fd1d/dms3rep/multi/Masonic+San+Francisco+Remodel+1.jpg" alt="Weathered wooden stairs with railings descend through trees toward a sunlit hillside neighborhood." title=""/&gt;&#xD;
  &lt;span&gt;&#xD;
  &lt;/span&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          It is not only a structural problem
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Moisture behind the walls can also mean mold, and black mold is particularly bad for people. Renters are especially exposed, because they are often in older buildings where mold can be in the finishes, behind the walls or in ductwork that picks it up, and they just do not know it is there. There are remediation companies that will come in and take samples of the air and of the walls to see what is growing.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          A wall with nothing inside it
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          On a foundation job in Piedmont, we were working for another general contractor who held the full remodel contract. The exterior stairs at the front ran beside a wall that did double duty as a guardrail and a stair wall, with sheetrock inside and stucco outside. There was no way to see what was going on inside it.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Reframing the garage opening meant taking down some of the sheetrock in the garage, and when we did, we could look into where the framing for that exterior wall should have been. There was no framing at all. Termites and rot had completely destroyed everything inside the wall, the framing, the sheathing and the paper, leaving a hollow shell of stucco. Johnny had not seen one as bad as that before.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          What happens when a remodel uncovers damage
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          When something like that is uncovered in the middle of a project, the first step is to open up enough to see how bad and how extensive the damage is. From there, the homeowners get a more comprehensive estimate, and they can say yes, say no and leave it for another time, or get someone else to bid on it.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          When there is already a larger permit for the project, there is often room for the repair to be captured under it, as long as everyone is transparent with the inspectors. On the Piedmont job, the stucco at the front was already coming off to reframe the garage opening, so extending the work to the stair wall was not a big ask.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Doing the work at that point is usually in the owner's interest. The crew is already on the ground, the building department is already involved, the permit can capture the work, and the stucco subcontractor is coming through afterward anyway. Clients are understandably frustrated to find more work and more cost, but in the end they usually go ahead, because the house is already open. On the Piedmont job, the repair was outside our structural scope, so the general contractor on the project took it on.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          When to bring in a waterproofing consultant
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          On a higher-end property with complex waterproofing transitions, such as exterior decking, handrails, balcony and deck attachments, and a history of leaks or poor installation, some owners hire a waterproofing consultant. The consultant assesses the existing conditions and puts together a plan that addresses every exterior waterproofing detail, with the products best suited to each one. The contractor then executes those details to the letter, in communication with the consultant.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          It can be expensive. Consultants want the best products and the best details, and that costs money. But for an owner who has already paid for a lot of remediation, and does not want to pay for it again, the plan does two things. It fixes the problem properly, and it gives them a fully detailed record to keep on file. When the time comes to sell, they can show the next owner what was done, who planned it, which products were used and who carried it out.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          We have worked with waterproofing consultants in the past. Between that and our own remediation work, we have a good understanding of where systems fail, which red flags to look out for, and the best practices for new installations at the points where exterior meets interior.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/6442fd1d/dms3rep/multi/Masonic+San+Francisco+2.jpg" length="930163" type="image/jpeg" />
      <pubDate>Mon, 23 Nov 2026 13:01:53 GMT</pubDate>
      <guid>https://www.oakironbuildworks.com/what-home-inspections-miss</guid>
      <g-custom:tags type="string">Foundations &amp; Seismic Retrofitting,Structural and Seismic,Exteriors &amp; Restoration,Waterproofing</g-custom:tags>
      <media:content medium="image" url="https://irp.cdn-website.com/6442fd1d/dms3rep/multi/Masonic+San+Francisco+2.jpg">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/6442fd1d/dms3rep/multi/Masonic+San+Francisco+2.jpg">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>Taking a Potrero Hill Duplex Back to Its Structure</title>
      <link>https://www.oakironbuildworks.com/potrero-hill-duplex-remodel</link>
      <description>A whole home remodel on Vermont Street in Potrero Hill: a new third floor, walk-on skylights, a garden roof and the permit changes along the way.</description>
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
                    
      Reading time: about 7 minutes
    
                  &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
                    
      TLDR
    
                  &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;ul&gt;&#xD;
    &lt;li&gt;
                    
      
      
    A duplex of about 2,800 square feet on Vermont Street, taken back to its structure and rebuilt with a new third floor over a little more than 12 months.
  
    
    
                  &lt;/li&gt;&#xD;
    &lt;li&gt;
                    
      
      
    Before any demolition, the finishes and fixtures the owners wanted to keep were removed and stored, including the original five-panel Victorian doors.
  
    
    
                  &lt;/li&gt;&#xD;
    &lt;li&gt;
                    
      
      
    A pair of walk-on skylights from England carries daylight from the garden roof down through the third floor and into a kitchen with no windows of its own.
  
    
    
                  &lt;/li&gt;&#xD;
    &lt;li&gt;
                    
      
      
    Changing the garden roof from unoccupied to occupied during construction triggered a fire sprinkler system and a new water service.
  
    
    
                  &lt;/li&gt;&#xD;
  &lt;/ul&gt;&#xD;
  &lt;p&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
                    
      On Vermont Street, on top of Potrero Hill in San Francisco, a young couple whose son was a year or two old when the project started brought us in to remodel their duplex. The house runs to about 2,800 square feet, and our scope ran a little over 12 months.
    
                  &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
                    
      We were initially brought in for the preparation work, the structural work, the demolition, and the concrete and framing. From there, the clients asked us to take on the electrical, plumbing and HVAC, and on into the finishes. We did the insulation, the drywall and the flooring, the trim carpentry for the doors and baseboards, the exterior siding, the windows and doors, the roofing and the exterior painting. The clients took on the installation of the kitchen themselves.
    
                  &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
                    
      The house as we found it
    
                  &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
                    
      The ground floor held an in-law unit on one side, which the clients used for a live-in nanny, with two bedrooms, a bathroom, a kitchenette and a living room at the back. A single-space garage sat on the other side. The arrangement is very common in San Francisco: a garage on one side of the lower level and a self-contained unit on the other.
    
                  &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
                    
      The lower part of the house is Victorian, with 10-foot ceilings on the second floor. At the back of the top of the building there was a small addition, a kind of third floor that really was not much to speak of.
    
                  &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
                    
      Saving what was worth keeping
    
                  &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
                    
      Before any demolition, we coordinated with the homeowners on the finishes and fixtures they wanted to save. We removed them and put them into storage, so they would be kept safe until after the project.
    
                  &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
                    
      The original doors were five-panel Victorian doors. The clients wanted to keep the Victorian style, so we saved the doors, put new jambs on them and rehung them at the end of the project.
    
                  &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
                    
      Structure for a new floor
    
                  &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
                    
      Demolition started on the ground floor, to allow room for the structural upgrades. New steel, new framing members and new concrete went in on the ground floor to support the additional story on top of the building. On the elevations, the house was demolished down to a line, and everything at the back above that line, including the pop-out and the roof structure, is new construction.
    
                  &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
                    
      The second floor footprint changed as well, and some interior walls moved to suit the owners' new layout. The biggest change was the stairs. The original stair wound up the back of the property from the ground floor all the way to the top, and the front floors were reached from the street by their own stairs. In the new layout, a stair runs from the street to the second floor, and a second set runs straight in from the entrance up to the third floor. The back stairwell still serves the ground and first floors, changed only slightly.
    
                  &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
                    
      The new third floor
    
                  &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
                    
      The new top floor has a primary bedroom at the back with a walk-in closet and a primary bath, a new laundry with a stackable washer and dryer, two guest bedrooms, and a hall bath with its own shower. The lower floors have 10-foot ceilings, so we wanted as much as possible to mirror that height in the new floor.
    
                  &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
                    
      A light well through two floors
    
                  &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
                    
      The kitchen was closed in. With a property on either side, it had no windows of its own. The closest windows were the breakfast nook at the back of the house and the dining room windows at the front.
    
                  &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
                    
      The architect's idea was an inset 
  
  
      
                    &lt;b&gt;
                      
        
    
    walk-on skylight
  
  
      
                    &lt;/b&gt;
                    
      
  
   in the floor of the third floor, at the top of the stairs, mirrored by a second skylight in the flat roof directly above it. Together they act as a light well, carrying daylight from the roof down through the third floor and into the kitchen, just beside the stove.
    
                  &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
                    
      We could not find a company in America making structural walk-on skylights, so the units came from Glazing Vision in England. They were very strong, structurally very sound and very heavy, and we brought in a crane to get them into position on the roof. The skylights over the dining room table are standard curb-mounted Velux units.
    
                  &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
                    
      The garden roof
    
                  &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
                    
      The flat roof at the top of the building is a garden roof. It was finished with a 
  
  
      
                    &lt;b&gt;
                      
        
    
    Kemper
  
  
      
                    &lt;/b&gt;
                    
      
  
   roofing membrane, a liquid-applied product with a polyester underlayment and a long warranty. The clients specifically wanted the Kemper system, so we found a roofing contractor with experience installing it, and they were very professional. It was the first time Johnny had used the product.
    
                  &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
                    
      A stainless steel handrail runs around the roof to make it safe. From the top of Potrero Hill, on a good day, the views run all the way to downtown, across to the Dogpatch and back over to Twin Peaks, with the whole skyline right there.
    
                  &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
                    
      The back roof area, over the primary bedroom and its bathroom, is a service roof, and the condensers for the HVAC units sit up there.
    
                  &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div&gt;&#xD;
  &lt;img src="https://irp.cdn-website.com/6442fd1d/dms3rep/multi/Roof.jpeg" alt="" title=""/&gt;&#xD;
  &lt;span&gt;&#xD;
  &lt;/span&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
                    
      Keeping the ceilings high
    
                  &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
                    
      The clients wanted high ceilings and open-plan space, so we put a lot of effort into concealing the ducting. On the second floor, the unit for the HVAC system sits in a drop ceiling in the bathroom, and serves the game room, the living room, the breakfast nook and the bathroom.
    
                  &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
                    
      The fan coil for the second floor living area and the third floor sits in the A-frame roof at the front of the property. We ran its ducting through the A-frame roof along the roof joists, punched through the wall at the top of the curb for the flat roof, ran it along that roof, and brought it back in through the roofing envelope above the primary bedroom. That way the living area did not lose any ceiling height.
    
                  &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
                    
      Service and permit changes
    
                  &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
                    
      There was a significant amount of electrical work. We put in a new 200-amp service off the street, coordinating with PG&amp;amp;E, who had to upgrade the nearest transformer to a higher capacity to carry it.
    
                  &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
                    
      The garden roof was initially supposed to be unoccupied, used only for servicing, not a place to spend time. During construction, the clients changed the permit for the roof from unoccupied to occupied, so they could use it as a space to hang out. That change triggered a requirement for a fire sprinkler system throughout the building. A specialist subcontractor came on to design the system, and because there was not enough water coming into the property to supply it, the water service at the front had to be upgraded. We coordinated with the San Francisco Water Department, the city and the fire department to get it through.
    
                  &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
                    
      The envelope
    
                  &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
                    
      Once the roofing was done, we installed all the windows and doors ourselves and did all the exterior waterproofing. The siding is a 1x10 
  
  
      
                    &lt;b&gt;
                      
        
    
    cove siding
  
  
      
                    &lt;/b&gt;
                    
      
  
   to match the existing, and the windows are Andersen 400 Series double-glazed units.
    
                  &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
                    
      Finishes
    
                  &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
                    
      Inside, the windows have a 
  
  
      
                    &lt;b&gt;
                      
        
    
    drywall return
  
  
      
                    &lt;/b&gt;
                    
      
  
   rather than trim. The drywall wraps around the corner and butts to the window frame. It takes a little more time at the drywall stage, adjusting the furring strips to hold an even reveal on each side, but it gives a nice, clean, modern finish, and it saves the cost of the finished trim. It also helps where space is tight. Casing usually needs a minimum of about 3 1/2 inches on either side of a window, while a drywall return needs only the 5/8 clearance for the drywall, so in a tight corner the window opening can be as large as possible.
    
                  &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
                    
      After the insulation, the roofing and the electrical, HVAC and plumbing rough-in, the drywall and tiling subcontractors came in. The tilers put the waterproofing membranes into the showers, and the pans were tested and signed off by the city before any tile was set.
    
                  &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
                    
      The clients selected the tiles and the layout, and kept it straightforward. They wanted consistency throughout: slate on the floors, and a medium-format white tile at 12 by 24 inches on the bathroom walls and shower enclosures.
    
                  &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
                    
      What the project took
    
                  &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
                    
      By the time our scope was through, the project had run a little over 12 months. It was a lot, with the structural work, the new floor, the imported skylights, the service upgrade, and the sprinkler system and water service brought on partway through, but we got through it, and it was a great project to take on.
    
                  &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;em&gt;
                      
        
    
    If you're looking for a competent contractor who, most importantly, is completely trustworthy and honest, look no further than Johnny at Caliber. Johnny and his crew did an outstanding job for our renovation projects. My only regret is that I don't have more properties for Johnny to renovate for me.
  
  
      
                    &lt;/em&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;b&gt;
                      
        
    
    P.K.
  
  
      
                    &lt;/b&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
                    
      Review of Caliber Construction, now Oak &amp;amp; Iron Buildworks
    
                  &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/6442fd1d/dms3rep/multi/Roof+2.jpeg" length="789859" type="image/jpeg" />
      <pubDate>Mon, 09 Nov 2026 13:15:31 GMT</pubDate>
      <guid>https://www.oakironbuildworks.com/potrero-hill-duplex-remodel</guid>
      <g-custom:tags type="string">ADUs &amp; Additions,Foundations &amp; Seismic Retrofitting,Structural and Seismic,Architecture and Design</g-custom:tags>
      <media:content medium="image" url="https://irp.cdn-website.com/6442fd1d/dms3rep/multi/Roof+2.jpeg">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/6442fd1d/dms3rep/multi/Roof+2.jpeg">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>What Makes a Shower Last: Waterproofing, Tile and Glass</title>
      <link>https://www.oakironbuildworks.com/shower-waterproofing-tile-glass</link>
      <description>How a shower is waterproofed, tested and signed off before tile, and the tile, glass and detailing choices that decide how a bathroom looks and lasts.</description>
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Reading time: about 8 minutes
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          TLDR
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;ul&gt;&#xD;
    &lt;li&gt;
          The critical parts of a bathroom are the waterproofing, the tile and the glass. Get those right and the room will look good.
         &lt;/li&gt;&#xD;
    &lt;li&gt;
          Every shower pan is tested and signed off by the city before any tile goes on.
         &lt;/li&gt;&#xD;
    &lt;li&gt;
          Tile is where the budget range is widest, and the quality of the installation is what you see every day.
         &lt;/li&gt;&#xD;
    &lt;li&gt;
          The glass, the blocking behind it and small details like the drain and the niche are settled before the walls are closed.
         &lt;/li&gt;&#xD;
  &lt;/ul&gt;&#xD;
  &lt;p&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          For us, the critical part of a bathroom is the tile: the selection of the tile and the execution of the tile. Then the waterproofing, and then the glass. Get those things right, pick nice fixtures, be mindful about the finishes you are using, and the room is going to look good.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          The waterproofing has to be done properly, but what you are going to see every day is the tile and how it was installed: grout lines that are clean and uniform, the same depth and the same thickness throughout, and a layout that has symmetry even in an unusual room, rather than a big cut piece of tile stuck in a corner someplace.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          The waterproofing sequence
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          The order of work in a shower is what makes it last. Our tiler comes out first and does the waterproofing. The pan is then inspected, and the city has to come out and sign off on it to make sure everything is waterproof. Only after the city signs off does the tiler come back, install the tile and grout it. The plumbers then come back and trim out the shower, and once the tile is in, the glass company comes out to take measurements and template the glass.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Liquid-applied waterproofing products are now the go-to. Very few clients are looking for PVC pans anymore. A liquid-applied membrane is a better product. It can stretch to accommodate seismic activity, and as a result we do not typically see failing waterproofing in modern shower retrofits unless the installation was poorly done.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          The tiler we use prides himself on his waterproofing. In the eight or nine years Johnny has been using him, there has never been a callback.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          Behind the tile
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          The walls in a bathroom get mold-resistant sheetrock, fixed with galvanized fasteners. Behind the tile goes an underlayment: DensShield is the typical one, with cement board or Hardie board as the alternatives, and Schluter now has a lot of products for underlayment as well.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Floors in older buildings need more attention than walls. If you have older timber floors, cracked concrete, or a retrofit into a building where something is not quite right with the foundation, an anti-fracture membrane goes down underneath the tile. It gives the floor more strength, so that new tile does not crack even if you get some seismic activity and some shakes.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          Showers
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          A
          &lt;b&gt;
           curbless shower
          &lt;/b&gt;
          , also called a wet room or an accessible shower, is one of the most common requests we see. The floor comes in and transitions straight into the shower, with no curb to step over, so someone older or with mobility issues can walk or roll straight in. The framing has to be set up to accommodate the slope, because the fall toward the drain starts beyond the envelope of the shower itself.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;b&gt;
           Linear drains
          &lt;/b&gt;
          have become more popular in showers too. Instead of a small 6-inch round drain that all the water flows to, a linear drain runs about 2 inches wide by 36 inches long, or whatever the width of the enclosure is, set flush with the tile. A tile-in version has a small tray that the tiler fills with tile to match the floor, so all you see is a reveal of about 1/8 of an inch around the drain, enough for the water to flow without affecting the look of the tile.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;b&gt;
           Steam showers
          &lt;/b&gt;
          need an enclosure that holds steam, and often a transom window above the door that can be opened to let some of the steam out when it gets too hot.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Some clients have asked for a window in the shower. We recommend avoiding one if it can be avoided, but sometimes it is the only option. In that case we recommend a vinyl window, because the water and the amount of moisture in the air will cause warping over time, even with an aluminum-clad unit with a wooden trim on the interior. The window also needs a proper waterproofed pan around it on the interior, and a slope away from it.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Fans with humidistats are required by code in every bathroom with a shower or bath. The humidistat senses humidity and kicks the fan on once it passes a set percentage, which stops condensation building up on the walls and the mold that follows. The fan has to be ducted to the exterior, at least 3 feet clear of any window or door.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          Choosing tile
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          San Francisco and the East Bay are full of design showrooms that show different formats of tile and the range of what you can spend. You can go with budget off-the-shelf tile that is supplied locally or nationally, or with more premium products that are bespoke, handcrafted or small batch, some of them coming from Italy. Fireclay in San Francisco is a good resource for more individual tile selections.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Formats move in and out of fashion. A long 3x6 tile has become very popular for showers and shower enclosures. On a bathroom remodel and bedroom addition in Oakland for an architect, Jeffrey LaBoskey, a green long-format tile on the walls turned out really nice where it met the niche.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          A niche is a little inset in the shower wall, waterproofed and tiled out, where you can keep body wash and the like. Some people like to put an accent tile in the niche to break up the wall, such as a penny round or a small hex pattern, and make a feature piece out of it. When there is a stone shelf or bench in the niche, we can use the same stone for the vanity, so the two connect visually.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          At the other end of the scale, large-format porcelain slabs now come in 4 by 8 foot sheets, and even 4 by 10 and 4 by 12, and can face a whole shower enclosure. Installing them is a specialized process, but most of the stone installers and stone fabricators will take it on.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          On grout, our advice is always the same: use a darker grout where possible, especially on floors and in showers. Light grout gets grubby, and scrubbing grout is no fun. A darker grout, even charcoal, makes the shower easier to maintain. With a white tile you can do a dark grout as a contrast.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Tile can be a large part of the budget. On a recent steam shower in San Francisco, half the cost of the project was the tile work.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          Glass
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          For shower doors, partitions and sliding doors, we usually work with Acacia Glass Company, a long-established company with a shop on Geary in San Francisco that does a lot of high-end work. Thomas Kenihan, the owner, is very good at talking clients through their options: the finishes on the hardware, the hinges, the mounting brackets, and the transoms on steam rooms. He talks through what type of glass, what layout, how many panels and where the anchor points go.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          There is a choice in the glass itself. Thicker glass can take on a green hue. A different glass, sold as sapphire, has a slightly different makeup that takes the green out and stays clear at thickness. It costs more, but it is worth considering when a bathroom has a lot of natural light through skylights or windows, or when designers have worked out specific colors and tones in the tile.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Tempered glass is required for any shower enclosure. There is also an easy-clean coating that can be applied at the factory, which makes the glass easier to wipe down after installation. It is an extra cost, but a good addition.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Before any of that, we put solid blocking all the way around the enclosure where we know there will be glass, so the glass company has the option to put anchors or screws wherever they need them. It is an easy fix for us at the start.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div&gt;&#xD;
  &lt;img src="https://irp.cdn-website.com/6442fd1d/dms3rep/multi/40+Mesa+Mill+Valley+Remodel+2.jpg" alt="Modern white bathroom with glass shower, large mirror, and double vanity sink." title=""/&gt;&#xD;
  &lt;span&gt;&#xD;
  &lt;/span&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          Vanities, lighting and the smaller details
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          A floating vanity, mounted to the wall with space underneath, is a more modern look that a lot of people like, and it lets the tile run all the way through. We can also frame out the wall for an inset vanity, so the mirror finish is flush or almost flush with the wall. The mirror opens to shelves and electrical outlets, so an electric toothbrush can charge inside with the door closed and everything looks clean.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Bathrooms are often tight. Where there is space for one, a pocket door avoids the conflict between a door swinging into the room and the shower door, the toilet or the vanity. In a small bathroom, mirrors placed properly make the space seem bigger.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Lighting is where you can get creative, with low-voltage options over the vanity and mirror. On Surrey Street in San Francisco, the designer called for a mud-in LED strip in the shower ceiling, an inch or an inch and a quarter wide, set flush with the drywall. It shines straight down onto the tile and creates light and shadow across it, which really makes the tile stand out.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Underfloor heating is a low-voltage electric mat that runs off a transformer and goes down on the floor before the cement underlayment and the tile. You can be specific about where it goes. There is little point putting it in the shower, where hot water is already running, but in front of the toilet and across the main floor it means walking from a warm wooden floor in the bedroom onto a warm tile floor rather than a cold one. It is a bit of a luxury, but not a huge addition to the cost, and it is especially nice in a colder house without good heating.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          For fixtures, the client chooses a finish, such as bronze, satin nickel or chrome. Satin or brushed nickel is the one we see most often.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div&gt;&#xD;
  &lt;img src="https://irp.cdn-website.com/6442fd1d/dms3rep/multi/Surrey+St+San+Francisco+Remodel+6.png" alt="Narrow bathroom vanity with white cabinet and mirror, reflecting patterned tile backsplash and wall light." title=""/&gt;&#xD;
  &lt;span&gt;&#xD;
  &lt;/span&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          Coordination is the rest of the job
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          A lot of a good bathroom comes down to coordination between the trades. With a wall-mounted fixture, the plumber and the tiler have to be coordinated precisely. If there are outlets or lights, and space is tight above a vanity or around wainscoting, the electrician has to be in on it too. The layout has to be right before anything is closed up.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          You can go as elaborate or as simple as you like. If you bring in a designer, they can push the tile options, the colors on the walls and the finishes as far as the project allows. Either way, the tile, the waterproofing and the glass are what decide whether the room works.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;em&gt;
           I worked with Johnny on a few different projects around our house, including work that required drywall repair, tile work, roofing repair, downspout install, etc. What I appreciate about Johnny is that he's a problem solver, who will listen to your ideas while also recommending other options that may be a better fit for what you really want. The team he works with also seems highly skilled, and the tile work that was done on one of our projects was excellent.
          &lt;/em&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;b&gt;
           Jay Beerman, Partnership Lead at Google
          &lt;/b&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/6442fd1d/dms3rep/multi/Crocker+Highlands+Oakland+Remodel+2.jpg" length="159037" type="image/jpeg" />
      <pubDate>Mon, 26 Oct 2026 12:00:08 GMT</pubDate>
      <guid>https://www.oakironbuildworks.com/shower-waterproofing-tile-glass</guid>
      <g-custom:tags type="string">Finishes,Bathroom Remodeling,Waterproofing</g-custom:tags>
      <media:content medium="image" url="https://irp.cdn-website.com/6442fd1d/dms3rep/multi/Crocker+Highlands+Oakland+Remodel+2.jpg">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/6442fd1d/dms3rep/multi/Crocker+Highlands+Oakland+Remodel+2.jpg">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>Choosing Finishes Without Leaving Your House</title>
      <link>https://www.oakironbuildworks.com/choosing-finishes-bay-area</link>
      <description>How samples brought to you and a priced finishes book let you choose stone, tile and cabinetry from your own kitchen table.</description>
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Reading time: about 6 minutes
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          TLDR
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;ul&gt;&#xD;
    &lt;li&gt;
          We bring samples to your house so you see them in the room and the light they will actually sit in.
         &lt;/li&gt;&#xD;
    &lt;li&gt;
          The finishes book sets out options with cost per square foot against the quantities your project actually needs.
         &lt;/li&gt;&#xD;
    &lt;li&gt;
          Finishes belong in the budget, not after it. Lead times mean a late decision moves the completion date.
         &lt;/li&gt;&#xD;
    &lt;li&gt;
          Decisions are due in order: anything affecting framing first, then tile and cabinetry, then paint and hardware.
         &lt;/li&gt;&#xD;
  &lt;/ul&gt;&#xD;
  &lt;p&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          There are more stones, tiles, cabinet finishes and fixtures available than anybody can reasonably sort through.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;em&gt;
           I worked with Johnny on a few different projects around our house, including work that required drywall repair, tile work, roofing repair, downspout install, etc. What I appreciate about Johnny is that he’s a problem solver, who will listen to your ideas while also recommending other options that may be a better fit for what you really want. He was always willing to walk me through the whole situation, clarify the work being done, make sure I was comfortable with everything that was happening, and then make adjustments as needed based on our discussions. The team he works with also seems highly skilled, and the tile work that was done on one of our projects was excellent. I would, and likely will, work with him again.
          &lt;/em&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;b&gt;
           Jay Beerman, Partnership Lead at Google
          &lt;/b&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          We bring samples to you
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          A range of stone with the price per linear foot. A box of decking material. A selection of cabinet door samples with the pre-finished colors that are available.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          You look at them in the room they are going into, in the light they will actually sit in, alongside the finishes you already have.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          The finishes book
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          For clients who want the process run comprehensively, we put together a
          &lt;b&gt;
           finishes book
          &lt;/b&gt;
          for the project. The book sets out the finishes available for each element, locally sourced, nationally sourced and imported, with the cost per square foot or per linear foot against each one.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Because we know the areas and lengths involved on your project, that book lets you do real arithmetic at your kitchen table. This tile is the one you like, and here is what it costs across the square footage you actually have. This stone is more than you want to spend, but this one sits close to it and comes in lower across the linear footage of your counters. Decisions get made with the numbers attached.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          Why this belongs in the budget, not after it
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          The range between one tile and another across the same square footage is substantial, and multiplied across a whole house it is one of the largest variables in a project.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Settling finishes during pre-construction rather than during the build means ordering happens on schedule rather than when a decision finally gets made.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Lead times are the reason that matters. Tile from Italy, custom cabinetry and made to order windows all take time to arrive, and a decision made late does not simply cost money, it moves the completion date.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          When each decision is needed
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Finishes decisions are not all due at once.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Anything that affects framing or rough in comes first, because those trades are early and the decisions are structural rather than aesthetic. Where a niche goes in a shower wall, whether a vanity is floating and therefore needs blocking set into the framing, where a light needs a box.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Tile, stone and cabinetry follow, driven by lead time rather than by sequence. Cabinetry gets designed and ordered well before it is installed, and stone is templated only once the cabinets are in.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Paint, hardware and fixtures come last, and can genuinely be left late.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div&gt;&#xD;
  &lt;img src="https://irp.cdn-website.com/6442fd1d/dms3rep/multi/Alameda+Kitchen+Remodel+4.jpg" alt="Bright bathroom vanity with white cabinets, gold handles, marble countertop, and wood floor under a lit mirror" title=""/&gt;&#xD;
  &lt;span&gt;&#xD;
  &lt;/span&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          Stone
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Stone runs on its own process. Full custom means slabs bought whole and cut to size for your project. Semi-custom uses pre-finished slabs in standard lengths with a bullnosed front edge and one finished side, with matching pre polished backsplashes.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Once the cabinets are in, our fabricator
          &lt;b&gt;
           templates
          &lt;/b&gt;
          off the installed substrate, collects the slabs you selected, and cuts them in the shop on CNC and water jet machinery to a tolerance of around a thirty second of an inch. Nothing is cut on site.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div&gt;&#xD;
  &lt;img src="https://irp.cdn-website.com/6442fd1d/dms3rep/multi/Surrey+St+San+Francisco+Remodel+2.png" alt="Modern kitchen with white cabinets, black countertop, geometric backsplash, and central cooktop underneath a vent hood" title=""/&gt;&#xD;
  &lt;span&gt;&#xD;
  &lt;/span&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          Tile
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Tile is where the range is widest. At one end, off-the-shelf tile from local and national suppliers. At the other, small-batch handmade and imported work. Fireclay Tile on Brannan Street in San Francisco makes handmade ceramic, brick and glass tile in California and is a good place to start when you want something with variation in it.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          When a designer has a specific layout in mind, we mock it up with you before anything is set, give you options, and work through with our tilers what is achievable.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          One piece of advice we give consistently: go darker on grout than feels natural, especially on floors and in showers. A charcoal or mid tone grout keeps looking clean for years without weekend scrubbing, and a contrasting dark grout against white tile is a deliberate look in its own right.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          Cabinetry
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Cabinetry decisions run in a sequence and each one narrows the next. Stain grade or paint grade. Inset panels, shaker, raised panel or flush doors. Hardware. Then the cabinet bodies, where the range runs from fiberboard and melamine up to birch plywood.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Cabinet doors take more handling than almost anything else in a house and are the component that fails first, which is why the finish on them is worth spending on if you want the kitchen to last.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          Flooring
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          The practical questions are how much traffic it takes, whether it will get wet, and whether it needs to match something that already exists. A pre-finished hardwood arrives with its finish already cured in a factory, which is harder wearing than a site finish and means no drying time in the house. A site finished floor can be sanded flat across old and new together, which is what you want when an addition meets an existing floor and the two need to read as one surface.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          Fixtures and hardware
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Faucets and shower fittings are worth spending on for a practical reason as well. Internal cartridges and valves are what fail, and better fittings use serviceable parts that can be replaced rather than requiring the whole fitting to come out of a tiled wall.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          If you are working with a designer
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Plenty of our clients have an interior designer, and the process works the same way with one involved.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          What changes is who is driving the selections. The designer sets the direction and specifies, we price it against real quantities, and we tell them early where something will not work in the field so it can be resolved on paper. We mock layouts up with the clients and the designer before anything is set, give them options, and work with our tilers to see what is possible.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          What this looks like for you
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;ul&gt;&#xD;
    &lt;li&gt;
          Samples brought to your house and seen in the room they are going into
         &lt;/li&gt;&#xD;
    &lt;li&gt;
          A finishes book with real prices against real quantities for your project
         &lt;/li&gt;&#xD;
    &lt;li&gt;
          Showroom visits when you want them rather than because you have to
         &lt;/li&gt;&#xD;
    &lt;li&gt;
          Decisions made early enough that lead times do not move your completion date
         &lt;/li&gt;&#xD;
  &lt;/ul&gt;&#xD;
  &lt;p&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Choosing materials that suit their position, and finishes built to be handled daily, is what stops a kitchen or bathroom being replaced long before it needed to be. Where a client wants a specific sustainable product, we source a subcontractor experienced with it, as we did with the Kemper roofing system at Vermont Street.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/6442fd1d/dms3rep/multi/Alameda+Kitchen+Remodel+5.jpg" length="55632" type="image/jpeg" />
      <pubDate>Mon, 12 Oct 2026 12:00:06 GMT</pubDate>
      <guid>https://www.oakironbuildworks.com/choosing-finishes-bay-area</guid>
      <g-custom:tags type="string">Finishes,Bathroom Remodeling,Kitchen Remodeling</g-custom:tags>
      <media:content medium="image" url="https://irp.cdn-website.com/6442fd1d/dms3rep/multi/Alameda+Kitchen+Remodel+5.jpg">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/6442fd1d/dms3rep/multi/Alameda+Kitchen+Remodel+5.jpg">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>What Goes Into an Outdoor Kitchen in the Bay Area</title>
      <link>https://www.oakironbuildworks.com/outdoor-kitchen-bay-area</link>
      <description>Gas, electrical, permits, stainless steel and exterior rated cabinetry. What an outdoor kitchen involves and how long it should last.</description>
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Reading time: about 5 minutes
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          TLDR
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;ul&gt;&#xD;
    &lt;li&gt;
          An outdoor kitchen is a permitted project, because running a gas line requires a permit.
         &lt;/li&gt;&#xD;
    &lt;li&gt;
          Long gas runs and electrical capacity are the two things worth establishing at design rather than during installation.
         &lt;/li&gt;&#xD;
    &lt;li&gt;
          Every component is a different grade from its interior equivalent, and marble outdoors will etch in acidic rain.
         &lt;/li&gt;&#xD;
    &lt;li&gt;
          Anything buried cannot be staged. Gas, water, drainage and structure go in together even if appliances come later.
         &lt;/li&gt;&#xD;
  &lt;/ul&gt;&#xD;
  &lt;p&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Building an outdoor kitchen properly is a permitted construction project.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          Gas is the part that needs planning
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Running a gas line to an outdoor kitchen requires a permit.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          The technical question underneath it is whether your existing gas feed can carry the load at that distance. Gas pressure drops over a run, and an outdoor kitchen is usually at the far end of a property from where the service enters the house. A long run to a high demand appliance can mean the existing feed is not adequate, which changes the scope.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Long gas runs are one of the most common problems on these projects, and we know that the optimal time to scope it out properly is at the design phase.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          Electrical
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Outdoor kitchens need power for lighting, refrigeration, and increasingly for cooking appliances. All of it is exterior grade and grounded throughout, with GFCI protection and weather rated outlets, and exterior rated lighting to match.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Like the gas, the question is capacity and distance. A dedicated circuit run out to the kitchen is usually the right answer rather than extending something that already exists.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          Why everything is a different grade outside
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Every component in an outdoor kitchen is a different specification from its interior equivalent, and the reason is exposure.
          &lt;b&gt;
           Stainless steel
          &lt;/b&gt;
          is generally highly preferred for the same reasons it is preferred in commercial kitchens: hard wearing, rust resistant, easy to clean and food safe. Outdoors it also handles moisture, salt air and temperature swing without degrading.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Cabinetry has to be custom and built from exterior rated materials and composites. Interior cabinet construction, whether that is fiberboard, melamine or ordinary plywood, does not survive outdoors. Marine grade and composite materials do.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          Stone needs thought
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;b&gt;
           Stone
          &lt;/b&gt;
          for an outdoor kitchen is a material selection question rather than only an aesthetic one. Marble outdoors will be damaged over time by acidic rain, which etches the surface. Some stones handle exposure well and some do not, and the difference is not visible in a showroom.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          We bring samples to you and talk through what will hold up in your specific position, because a countertop under a covered structure on a sheltered side of a house faces a different life from one fully exposed on a hillside.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          Water, and whether you need it
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          A sink means a water supply run and a drain, and the drain is usually the harder half. Waste has to go somewhere, which means connecting to the sewer line, and the distance and level between the kitchen and that connection decides how straightforward it is.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          Appliances and layout
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          The grill is the obvious appliance and rarely the only one. Refrigeration, a side burner, a warming drawer and storage all come up, and each one carries requirements: power, gas, ventilation clearance and space around it.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          The layout question is the same one we ask about an indoor kitchen. Where do you prep, and how far is that from where you cook. Where does a hot pan go down.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Every foot between the house and the kitchen is trenching for gas, water and power.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          The structure it sits on
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          An outdoor kitchen usually sits on a deck or a patio, and often under a pergola or covered structure. All of that is construction in its own right.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          A deck carrying an outdoor kitchen carries concentrated loads that an ordinary deck does not, which affects the framing. A pergola or covered structure extends the season and gives the kitchen shelter, and is framed and detailed like any exterior structure.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Properties in the
          &lt;b&gt;
           Wildland Urban Interface
          &lt;/b&gt;
          , which covers a great deal of hillside Oakland, Berkeley and Marin, are subject to fire-rated requirements for decking and exterior assemblies. Establishing whether your property falls inside a WUI zone is worth doing before anything is designed.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          Lighting and using it after dark
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          All of it is exterior rated, and all of it is worth putting on separate switching so the space can be bright when you are cooking and dim when you are not. Running that wiring at the same time as everything else costs very little. Adding it afterward means opening things up again.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          Building it in stages
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          An outdoor kitchen does not have to arrive all at once.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          What cannot be staged is anything buried. Gas, water, drainage, electrical and the structure they sit in all have to go in together, because opening a finished deck or patio later to run a line costs more than running it in the first place. Appliances, cabinetry, a pergola and lighting can all follow later.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          If you think you might want a sink, a second burner or a covered structure eventually, the time to say so is at design, even if none of it is in the current budget.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          What it should last
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Built with good materials and appliances, and looked after, an outdoor kitchen should give you 15 to 20 years.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Looked after mostly means covering appliances when they are not in use, cleaning stainless steel before salt and grease sit on it, and resealing stone on the schedule it needs.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Building an outdoor kitchen in materials rated for exterior exposure is what keeps it out of a landfill in five years. Where decking is part of the project, bamboo is a Class A rated recycled composite worth considering.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/6442fd1d/dms3rep/multi/pexels-photo-30725657.jpeg" length="306123" type="image/jpeg" />
      <pubDate>Mon, 28 Sep 2026 12:00:00 GMT</pubDate>
      <guid>https://www.oakironbuildworks.com/outdoor-kitchen-bay-area</guid>
      <g-custom:tags type="string">Outdoor Living</g-custom:tags>
      <media:content medium="image" url="https://irp.cdn-website.com/6442fd1d/dms3rep/multi/pexels-photo-30725657.jpeg">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/6442fd1d/dms3rep/multi/pexels-photo-30725657.jpeg">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>Who Pulls the Permit, and Why It Matters</title>
      <link>https://www.oakironbuildworks.com/who-pulls-the-permit</link>
      <description>The difference between a contractor pulling your permit and pulling it yourself, what the job card means, and what unpermitted work costs later.</description>
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
                    
      Reading time: about 5 minutes
    
                  &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
                    
      TLDR
    
                  &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;ul&gt;&#xD;
    &lt;li&gt;
                    
      
      
    A permit is pulled either by a licensed contractor or by the homeowner, and whoever holds it carries the liability.
  
    
    
                  &lt;/li&gt;&#xD;
    &lt;li&gt;
                    
      
      
    The job card is the record that every stage was inspected and passed.
  
    
    
                  &lt;/li&gt;&#xD;
    &lt;li&gt;
                    
      
      
    Unpermitted work surfaces at sale, at insurance claim, and at your next permit application.
  
    
    
                  &lt;/li&gt;&#xD;
    &lt;li&gt;
                    
      
      
    Incomplete applications and uncoordinated drawings are common causes of delay.
  
    
    
                  &lt;/li&gt;&#xD;
  &lt;/ul&gt;&#xD;
  &lt;p&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
                    
      Almost everything major done to a house needs a permit. Structural work, additions, ADUs, a gas line run out to an outdoor kitchen, a window opening that changes size.
    
                  &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
                    
      Whose name goes on that permit decides who is liable for the work.
    
                  &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
                    
      What a permit application rests on
    
                  &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
                    
      A permit application is built on a coordinated set of drawings. The architectural drawings describe what is being built. The structural drawings describe what holds it up. Both are reviewed, and both have to be consistent with each other and with what the code requires before anything is stamped.
    
                  &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
                    
      Depending on jurisdiction and scope, a project may also go through planning review, which looks at questions the building code does not: how the work sits in its context, what is visible from the street, and what the neighborhood requires. On a protected property such as a San Francisco Victorian, planning review is where it is established that the work is in keeping with the existing architecture.
    
                  &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
                    
      Timelines vary considerably between jurisdictions.
    
                  &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
                    
      Two ways a permit gets pulled
    
                  &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
                    
      A permit for residential work is pulled either by a licensed contractor or by the property owner, under what is called an owner builder permit.
    
                  &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
                    
      When a licensed contractor pulls the permit, the contractor’s name and license number are on the job card. The contractor is the party responsible for the work, the party the inspector deals with, and the party who has to stand over what was built.
    
                  &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
                    
      When a homeowner pulls an owner builder permit, all of that sits with the homeowner. You are the permit holder, the liability for the work is yours, and you are the party the building department looks to.
    
                  &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
                    
      What the job card actually is
    
                  &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
                    
      The 
  
  
      
                    &lt;b&gt;
                      
        
    
    job card
  
  
      
                    &lt;/b&gt;
                    
      
  
   is the document posted on site through construction. Inspectors sign it at each stage: foundation, framing, rough electrical and plumbing, insulation, and so on through to final.
    
                  &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
                    
      A signed off job card is the record that the work was inspected and passed at every stage. That record is what a future buyer, a future lender and a future insurer will look for, which is why the final sign off matters as much as the permit itself.
    
                  &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
                    
      Why owner builder permits appeal
    
                  &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
                    
      People pull their own permits for understandable reasons. Doing so can look like a saving, and for genuinely small self performed work it sometimes is.
    
                  &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
                    
      Some clients come to us having already pulled one, and we are happy to come in and do the work. What is worth understanding before you choose that route is what changes: the permit holder is you, the liability sits with you rather than with your contractor, and the responsibility for making sure every stage is inspected and signed off is yours.
    
                  &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
                    
      Inspections through the build
    
                  &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
                    
      A permit is a sequence of inspections running alongside construction, and each one has to pass before the work it covers can be covered up.
    
                  &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
                    
      Foundation inspection happens before concrete is poured, with the forms and the reinforcing steel in place. Framing inspection happens once the structure is up and before insulation goes in. Rough electrical, plumbing and mechanical are inspected while the walls are still open. Insulation is inspected before drywall. Then drywall, and eventually final.
    
                  &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
                    
      Sequencing that properly is a scheduling exercise, because an inspection that has not happened blocks everything behind it.
    
                  &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
                    
      When an inspection does not pass
    
                  &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
                    
      Inspections sometimes turn up corrections, and that is a normal part of the process rather than a failure.
    
                  &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
                    
      An inspector may want additional blocking, a different fastener, or clarification on how something in the drawings has been executed. The correction is made, the inspector returns, and the work proceeds.
    
                  &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
                    
      What matters is who is managing that exchange. When the contractor holds the permit, the inspector deals with the contractor, and the correction is handled as part of the job. When the homeowner holds it, that conversation is theirs.
    
                  &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
                    
      Unpermitted work catches up
    
                  &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
                    
      Unpermitted work surfaces at three predictable moments.
    
                  &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
                    
      The first is sale. Disclosure obligations mean unpermitted work has to be declared, and a buyer will discount for it or ask for it to be resolved before closing.
    
                  &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
                    
      The second is insurance. A claim arising from work that was never permitted or inspected is a considerably more difficult conversation than one arising from work that was.
    
                  &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
                    
      The third is any subsequent project. When you next apply for a permit, the department sees the property record, and unpermitted work discovered at that point has to be dealt with before the new project can proceed.
    
                  &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
                    
      Retroactive permitting is possible, though slower, more expensive and occasionally impossible, because proving what is behind a finished wall means opening it up.
    
                  &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
                    
      Repairs and in-kind work
    
                  &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
                    
      Not everything requires a full permit set. When work is a genuine 
  
  
      
                    &lt;b&gt;
                      
        
    
    in-kind repair
  
  
      
                    &lt;/b&gt;
                    
      
  
   or replacement, replacing something that already exists with the same thing in the same place, the permitting route is usually simpler and faster.
    
                  &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
                    
      When a repair turns into a change, whether that is a different size opening, a different structural arrangement or additional square footage, the work does not qualify and the full route applies.
    
                  &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
                    
      What actually causes delay
    
                  &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
                    
      One common cause is an incomplete application, which does not start any clock and simply sits until the missing item arrives. Another is a conflict between the architectural and structural drawings that a reviewer catches, which sends the drawings back for coordination that should have happened before submission. A third is a scope that turns out to need planning review when nobody expected it, which adds a whole process rather than a delay within one.
    
                  &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
                    
      How we handle it
    
                  &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
                    
      We pull the permit in our own name. Our name is on the job card, we deal with the inspectors, and we take the project through to a signed off card at the end.
    
                  &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
                    
      We also handle the coordination that gets an application accepted in the first place, which is where most delay originates. An incomplete application does not start any clock, and completeness is the part we control.
    
                  &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/6442fd1d/dms3rep/multi/40+Mesa+Mill+Valley+Remodel+6.webp" length="48478" type="image/webp" />
      <pubDate>Mon, 14 Sep 2026 12:00:00 GMT</pubDate>
      <guid>https://www.oakironbuildworks.com/who-pulls-the-permit</guid>
      <g-custom:tags type="string">ADUs &amp; Additions,Foundations &amp; Seismic Retrofitting,Outdoor Living,Bathroom Remodeling,New Construction and Custom Homes,Exteriors &amp; Restoration,Kitchen Remodeling,Permitting</g-custom:tags>
      <media:content medium="image" url="https://irp.cdn-website.com/6442fd1d/dms3rep/multi/40+Mesa+Mill+Valley+Remodel+6.webp">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/6442fd1d/dms3rep/multi/40+Mesa+Mill+Valley+Remodel+6.webp">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>What Triggers a Seismic Upgrade During a Remodel or Addition</title>
      <link>https://www.oakironbuildworks.com/what-triggers-a-seismic-upgrade</link>
      <description>The three ways structural work arrives on a Bay Area project, and how to find out which applies to yours before you commit to drawings.</description>
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Reading time: about 5 minutes
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          TLDR
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;ul&gt;&#xD;
    &lt;li&gt;
          Structural work usually arrives attached to something else you wanted, by one of three routes.
         &lt;/li&gt;&#xD;
    &lt;li&gt;
          You decide to do it, a remodel opens up a load-bearing wall, or an addition triggers it through the permit.
         &lt;/li&gt;&#xD;
    &lt;li&gt;
          Mandatory soft story programs apply to multi-unit buildings. For most single-family homes a retrofit is a decision, not a requirement.
         &lt;/li&gt;&#xD;
    &lt;li&gt;
          Most of the cost is access rather than material, which is why doing it while the walls are open changes the arithmetic.
         &lt;/li&gt;&#xD;
  &lt;/ul&gt;&#xD;
  &lt;p&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Very few homeowners set out to do structural work. Structural work arrives, usually attached to something else you wanted.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          There are three ways it turns up, and knowing which one applies to your project changes how you plan it.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          One: you decide to do it
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          The first route is voluntary. You look at your house, go into the crawl space or the garage, and notice that there are very few foundation bolts, no plywood reinforcement on any of the walls, and not much connecting the building to the concrete underneath it.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          On older houses that is a common finding, sometimes with no bolts at all.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          Two: a remodel opens up the structure
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          The second route arrives through a remodel, and the usual version of it is a wall.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          You want the kitchen and the dining room to be one room instead of two, and the wall between them turns out to be carrying load. Taking that wall out means the load it was carrying has to travel somewhere else, which means a structural engineer, a set of drawings, and framing or steel to carry what the wall was carrying.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Once an engineer is involved and the framing is open, the scope frequently grows, and usually sensibly. If the shear walls are being touched anyway, adding proper reinforcement while the finishes are off costs a fraction of what it would cost as a separate job later.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div&gt;&#xD;
  &lt;img src="https://irp.cdn-website.com/6442fd1d/dms3rep/multi/Alameda+Kitchen+Remodel+7.jpg" alt="Dining room with table and chairs, open pass-through to a bright kitchen, and arched doorway." title=""/&gt;&#xD;
  &lt;span&gt;&#xD;
  &lt;/span&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          Three: an addition triggers it through the permit
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          When you build an addition or add a story, the project can trigger a required seismic upgrade through the permit, depending on the scale and cost of the work relative to the property. At that point the structural work is not optional. The upgrade is part of what has to happen for the permit to be issued.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          A rear addition is often the more straightforward version, because the new structure gets its own foundation and carries its own loads. A second-story addition is a different proposition entirely, because everything below has to be able to carry the new floor.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          On some houses the structural work below costs more than the new space above. Establishing which situation you are in is pre-construction work, and it happens before you commission a full set of drawings.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          What an inspection of your crawl space tells us
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          A first look under a house answers most of the questions people arrive with. We are counting foundation bolts and noting where they are. We are looking for shear nailing or plywood on the cripple walls, and usually not finding any on a house of a certain age. We are looking at how the framing above connects to the concrete below, and at whether anything has moved.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          We are also looking for water. When framing stays wet with no opportunity to dry, the wood breaks down, and what were load paths become soft wood.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          What about mandatory retrofit programs
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          San Francisco, Oakland and Berkeley all operate mandatory soft story retrofit programs, and they come up often enough in conversation to be worth clarifying.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Those programs apply to multi-unit residential buildings that meet specific criteria for age, size and ground floor configuration. Owners of those buildings work to published compliance deadlines.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Single-family homes are generally not covered, even when the house has living space over a garage, which is the classic soft story arrangement. For most homeowners a retrofit is therefore a decision rather than a legal requirement.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          What the work actually involves
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Whichever route brings you to it, the work itself is drawn from the same set of components.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;b&gt;
           Foundation bolts
          &lt;/b&gt;
          tie the sill plate to the concrete so that the house and its foundation move together. On an existing foundation that means drilling and epoxying anchors into concrete that is already carrying the building.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;b&gt;
           Cripple wall bracing
          &lt;/b&gt;
          addresses the short stud wall between the top of the foundation and the first floor, which on a house with a crawl space is usually the weakest point in the structure. Bracing one means sheathing it in structural plywood, nailed to a schedule the engineer specifies.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;b&gt;
           Shear walls
          &lt;/b&gt;
          resist lateral force along the length of a wall, and
          &lt;b&gt;
           hold downs
          &lt;/b&gt;
          stop the ends of those walls lifting under load and carry that uplift into the foundation.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          When there is not enough solid wall to work with, which is the situation a garage opening creates, a
          &lt;b&gt;
           moment frame
          &lt;/b&gt;
          provides lateral resistance without needing one.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          How the work gets priced
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Whichever route brings the work to you, structural work is priced from engineered drawings rather than from a walkthrough. If there is no engineer on the project yet, we bring one in.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          The engineer looks at the loads, works out how they are best supported, and produces a set of drawings describing what has to be built. From those drawings we price the materials and the labor and give you an estimate.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          Why the walls being open changes the arithmetic
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Most of the cost in structural work is access and labor rather than material.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          When you do remodel work, you strip all the finishes away and the framing is exposed. At that point, you have an opportunity to reinforce it.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Timing is the practical reason we raise structural work during a remodel even when nobody asked about it.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          How to find out which applies to you
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          An engineer decides, and the permit confirms it.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          What we can do before that point is look at the property with you and tell you what we see, and give you a realistic picture of whether the project you are describing is likely to bring structural work with it.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/6442fd1d/dms3rep/multi/40+Mesa+Mill+Valley+Kitchen+2.jpg" length="58391" type="image/jpeg" />
      <pubDate>Mon, 31 Aug 2026 12:00:00 GMT</pubDate>
      <guid>https://www.oakironbuildworks.com/what-triggers-a-seismic-upgrade</guid>
      <g-custom:tags type="string">ADUs &amp; Additions,Foundations &amp; Seismic Retrofitting,Structural and Seismic,ADUs</g-custom:tags>
      <media:content medium="image" url="https://irp.cdn-website.com/6442fd1d/dms3rep/multi/40+Mesa+Mill+Valley+Kitchen+2.jpg">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/6442fd1d/dms3rep/multi/40+Mesa+Mill+Valley+Kitchen+2.jpg">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>Why San Francisco Seismic Requirements Went Up in 2026, and What It Means for Your Remodel</title>
      <link>https://www.oakironbuildworks.com/san-francisco-seismic-requirements-2026</link>
      <description>The seismic load requirement in San Francisco rose 10 percent in 2026. What that changes on a remodel, and why the submission date matters.</description>
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Reading time: about 6 minutes
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          TLDR
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;ul&gt;&#xD;
    &lt;li&gt;
          In 2026 the seismic load requirement in San Francisco increased by 10 percent.
         &lt;/li&gt;&#xD;
    &lt;li&gt;
          Your permit is reviewed against the code in force when you submit, not when you started designing.
         &lt;/li&gt;&#xD;
    &lt;li&gt;
          A 10 percent change in the load does not translate to 10 percent more work.
         &lt;/li&gt;&#xD;
    &lt;li&gt;
          Your soil and slope affect the load as much as the code does, which is why pricing cannot come from a walkthrough.
         &lt;/li&gt;&#xD;
  &lt;/ul&gt;&#xD;
  &lt;p&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          In 2026 the seismic load requirement in San Francisco increased by 10 percent. If you are planning a remodel, an addition or any structural work in the city, that change affects what your engineer specifies and what the work costs.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          The timing of a permit submission can decide which version of the code your project is measured against.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          What a seismic load requirement is
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          When an engineer designs the structure of a building, they are designing it to resist forces. Gravity is the obvious one, pulling everything down. The other is lateral force, which pushes sideways, and in this region the main source of lateral force is an earthquake.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          The
          &lt;b&gt;
           seismic load
          &lt;/b&gt;
          is the sideways force the structure is required to be able to resist without failing. The number comes out of ground motion data, fault mapping, soil conditions and the accumulated record of what actually happens to buildings during earthquakes.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          When the required load goes up by 10 percent, every element in the lateral system has to be able to handle 10 percent more. In practice that means more shear panels or larger ones, more hold downs, heavier connections, and in some cases a moment frame where a shear wall would previously have been sufficient.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          Why building codes change
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Codes are revised on a regular cycle rather than in response to any single event, and each revision folds in new research and new data. Ground motion modeling improves. Fault mapping gets more precise. Engineers study what failed and what held in earthquakes here and elsewhere, and the requirements move accordingly.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           
         &lt;/span&gt;&#xD;
    &lt;span&gt;
          I know Johnny from Caliber Construction and can confidently recommend him. His knowledge of structural work is solid, and he stands out in organizing trades and preconstruction planning. He knows how to navigate the ins and outs of both new construction and remodeling; he thinks ahead and keeps projects moving in the right direction. If you’re in the Bay Area and need a GC who knows what he’s doing, Johnny has the skills and knowledge to get the job done right.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           
         &lt;/span&gt;&#xD;
    &lt;strong&gt;
          Edgar Evangelia, Owner at Point Vertex Construction
         &lt;/strong&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          Your permit is reviewed against the code in force when you submit
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          A building permit is assessed against the code in effect at the time the application is submitted, not the code that applied when you started thinking about the project, and not the code that applies when construction begins.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          For most projects the timing is simply a fact to be aware of. For a project that has been in design for a while, or one where drawings have been sitting waiting for a decision, it can mean a set of structural drawings needs revisiting before submission.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          What changes on your project
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          For a straightforward interior remodel with no structural work, nothing changes. The seismic requirement applies to the structure, so if you are not touching the structure it does not arise.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          For anything structural, the effect shows up on the engineered drawings. You will see more plywood shear panels and more nailing, more and heavier hold downs, larger framing members or engineered lumber where standard sections would previously have done, and steel specified in situations that used to be resolved in wood.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          As a proportion of a whole project the additional cost is usually modest, because most of the expense in structural work is access and labor rather than the material itself. Adding more nails to a shear panel that is already being installed costs very little. Adding a shear panel to a wall that has to be opened up specially costs a great deal more.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div&gt;&#xD;
  &lt;img src="https://irp.cdn-website.com/6442fd1d/dms3rep/multi/Pennsylvania+Remodel+2.jpeg" alt="Green residential building with exterior stairs, bay windows, and blue recycling bins in a driveway." title=""/&gt;&#xD;
  &lt;span&gt;&#xD;
  &lt;/span&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          What 10 percent looks like on a wall
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Take a shear wall in a garage, sheathed in structural plywood and nailed to a schedule the engineer specifies. The
          &lt;b&gt;
           nailing schedule
          &lt;/b&gt;
          is what makes a shear panel work: how far apart the nails sit along the edges of each sheet, and how far in from the edge they land.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          A higher required load means a tighter schedule, closer nail spacing, and often a thicker sheet. A tighter schedule can also mean the panel needs a hold down at each end where it previously did not, and hold downs transfer uplift into the foundation, which means the foundation under that wall has to be able to take it.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          That chain of requirements is why a 10 percent change in the headline number does not always translate to a 10 percent change in the work, and why the engineered drawings are the only reliable guide to what your project actually needs.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          Your ground matters as much as the code
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Two houses on the same street can carry different seismic requirements, because the load an engineer designs for depends on what the building is standing on as well as what the code asks for.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Soil type is the main variable. Dense rock transmits ground motion differently from soft or filled ground, and soft soil can amplify shaking considerably. Slope matters too, since a hillside property has lateral forces acting on it that a flat lot does not, and the foundation has to resist both.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Large parts of the Bay Area sit on ground that has been modified over the last century and a half, whether that is fill, former marsh, or a hillside that has been cut and benched to make a building pad.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Ground conditions are one of several reasons a price for structural work cannot come from a walkthrough.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          What it does not mean
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          A code change does not make your existing house non compliant. Buildings are assessed against the code in force when they were permitted, and a house built to the 1955 code remains a legal building.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          What a code change does is set the standard for new work. When you build something new, or when you alter enough of the existing structure that the permit requires it, the new work meets the current standard.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          What to do if you are mid-design
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          If your project has been drawn but not yet submitted, it is worth a conversation with your engineer before the application goes in. A set of drawings prepared against the previous requirement will be reviewed against the current one, and finding that out at plan check costs more time than checking it now.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          If you are not doing a remodel
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Plenty of people read about a code change and wonder whether they should do something about their own house regardless.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          A voluntary upgrade is always available. You are not obliged to wait for a remodel or an addition, and the work is the same work: foundation bolting, cripple wall bracing, shear panels and hold downs, designed by an engineer and installed to their drawings.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          What changes is the cost, because a voluntary retrofit pays for access that a remodel would have provided anyway. On a house with an accessible crawl space or an unfinished garage, that difference is small and a standalone retrofit makes good sense. On a house where the relevant walls are finished, it is worth considering whether the work is better done alongside something else you already want.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Strengthening a building that already exists keeps it standing and in use, which is a better outcome for the material in it than any replacement.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/6442fd1d/dms3rep/multi/Pennsylvania+Remodel+1.jpeg" length="750336" type="image/jpeg" />
      <pubDate>Mon, 17 Aug 2026 12:00:00 GMT</pubDate>
      <guid>https://www.oakironbuildworks.com/san-francisco-seismic-requirements-2026</guid>
      <g-custom:tags type="string">Foundations &amp; Seismic Retrofitting,Structural and Seismic,Permitting</g-custom:tags>
      <media:content medium="image" url="https://irp.cdn-website.com/6442fd1d/dms3rep/multi/Pennsylvania+Remodel+1.jpeg">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/6442fd1d/dms3rep/multi/Pennsylvania+Remodel+1.jpeg">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>How Pre-Construction Planning Sets a Budget That Holds</title>
      <link>https://www.oakironbuildworks.com/pre-construction-budget</link>
      <description>What happens before drawings exist, why unknowns drive cost, and how a build-ready set of drawings produces a budget that holds.</description>
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Reading time: about 5 minutes
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          TLDR
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;ul&gt;&#xD;
    &lt;li&gt;
          Pre-construction weeds out a lot of the unforeseens and unknowns before construction starts.
         &lt;/li&gt;&#xD;
    &lt;li&gt;
          Feasibility answers whether the thing you want is the thing you should build, before drawings are paid for.
         &lt;/li&gt;&#xD;
    &lt;li&gt;
          Rough numbers come early, alongside the first drawings.
         &lt;/li&gt;&#xD;
    &lt;li&gt;
          A build-ready set of drawings greatly reduces the likelihood of contingency budgets, overages and change orders.
         &lt;/li&gt;&#xD;
  &lt;/ul&gt;&#xD;
  &lt;p&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Pre-construction is where a lot of the unforeseens and unknowns get weeded out before the construction process starts.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;em&gt;
           I am an architect and was connected to Johnny by a mutual structural engineer colleague. I hired Johnny to do a modest renovation to my house in Oakland in 2022/23. The scope of my project was to add a bedroom, bathroom, and laundry room, renovate another bathroom, insulate, update utilities, and add a skylight. I had a tight budget and tight schedule with a baby on the way. In pre-construction, Johnny helped me figure out the scope of the project that would fit my budget and how we could implement it as efficiently as possible. Johnny was very transparent with pricing and approached several subcontractors to find the best options for our project when appropriate. Johnny and his team completed our project on time and worked with me to efficiently address unforeseen conditions in our 1941 house along the way. As an architect, I had a few fussy design details that I cared about and the caliber team pulled them off. The neighbors appreciated how clean and respectful he and his team were.
          &lt;/em&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;b&gt;
           Jeffrey LaBoskey, award-winning Bay Area architect
          &lt;/b&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Review of Caliber Construction, now Oak &amp;amp; Iron Buildworks
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          It starts before there are drawings
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Most of our projects begin before drawings exist. Somebody has bought a property and wants to change it, or they want to add to the back of the house, or they have a room that does not work.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          We start with a site visit. We walk the property, look at the existing conditions and the existing finishes, and talk through what you are hoping to get out of the space. If the intention is to work with what is already there, those existing finishes become the starting point. If the intention is to change the finishes throughout, we work from that instead.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          People arrive at this conversation from very different places. Some clients have a full brief and a clear picture. Others know only that they want an addition and are not sure whether they need drawings first. Both are fine.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          Feasibility answers a specific question
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Once we understand the intention, we bring in an architect and open a direct line between the architect and you. The architect measures the existing building and begins to draw. We run the feasibility questions alongside: what the structure will carry, what the site will take, where the utilities are, and what the city is likely to require.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Feasibility answers whether the thing you want is the thing you should build.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          An addition at the back of a house is often reasonably straightforward, depending on what is already there. The new structure gets its own foundation and carries its own loads. Adding a floor to the top of the same house can be an entirely different proposition, because everything below has to be able to carry the new floor. Carrying a new floor can mean new foundations, new framing, steel, and a seismic upgrade through the whole ground floor.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          Rough numbers, early
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Alongside the early drawings, and depending on whether you want to move forward, we give you some rough numbers to get an idea of where things are going.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          The pre-construction agreement
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          If you want to go ahead, the project moves from a time and materials footing onto a pre-construction agreement.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          A pre-construction agreement is the point at which the architect is engaged on a contracted basis, the structural engineer comes on board, and the project gets properly worked out rather than sketched. The arrangement warrants its own agreement because the work involved is real: coordination, pricing, measurement, revisions, and a good deal of legwork with subcontractors before anyone has poured any concrete.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Projects requiring significant planning, architectural or structural input tend to warrant this structure. A single door replacement does not, and we would simply measure it, price it and send you an estimate.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          What build-ready actually means
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          The aim of all this preparatory work is to arrive at the start of construction with a set of drawings that has been properly worked through.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          A build-ready set means the structural and architectural intentions agree with each other, the finishes have been selected and priced, and the things that would otherwise surface mid build as unknowns have been identified in advance.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          A build-ready set also means that when something does come up, and on an older house something usually does, you can see clearly what the problem is, why it came up and how we intend to solve it.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div&gt;&#xD;
  &lt;img src="https://irp.cdn-website.com/6442fd1d/dms3rep/multi/Alameda+Kitchen+Remodel+1.jpg" alt="Bright galley kitchen with white cabinets, gas stove, sink, and gold faucet by windows" title=""/&gt;&#xD;
  &lt;span&gt;&#xD;
  &lt;/span&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          Finishes are part of the budget
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          The range between one tile and another across the same square footage is very wide.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          For clients who want the process run comprehensively, we put together a finishes book for the project, setting out the options for each element, locally sourced, nationally sourced and imported, with the cost per square foot or per linear foot against each one. Because we know the areas and lengths involved on your project, that book lets you do real arithmetic before anything is ordered.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          What this looks like for you
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;ul&gt;&#xD;
    &lt;li&gt;
          A clear understanding of what your property will allow and what it will resist
         &lt;/li&gt;&#xD;
    &lt;li&gt;
          Early drawings you can react to, and an architect you are speaking to directly
         &lt;/li&gt;&#xD;
    &lt;li&gt;
          Rough numbers at a point where they can still change the plan
         &lt;/li&gt;&#xD;
    &lt;li&gt;
          A coordinated set of drawings before construction rather than during it
         &lt;/li&gt;&#xD;
    &lt;li&gt;
          A budget built on a picture that is close to complete
         &lt;/li&gt;&#xD;
  &lt;/ul&gt;&#xD;
  &lt;p&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/6442fd1d/dms3rep/multi/Crocker+Highlands+Oakland+Remodel+1.jpg" length="165911" type="image/jpeg" />
      <pubDate>Mon, 03 Aug 2026 12:00:00 GMT</pubDate>
      <guid>https://www.oakironbuildworks.com/pre-construction-budget</guid>
      <g-custom:tags type="string">Finishes,ADUs &amp; Additions,Foundations &amp; Seismic Retrofitting,Outdoor Living,Bathroom Remodeling,New Construction and Custom Homes,Exteriors &amp; Restoration,Kitchen Remodeling,Architecture and Design</g-custom:tags>
      <media:content medium="image" url="https://irp.cdn-website.com/6442fd1d/dms3rep/multi/Crocker+Highlands+Oakland+Remodel+1.jpg">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/6442fd1d/dms3rep/multi/Crocker+Highlands+Oakland+Remodel+1.jpg">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>Waterproofing an Exterior Stair, and What Happens When It Fails</title>
      <link>https://www.oakironbuildworks.com/waterproofing-exterior-stairs</link>
      <description>How water gets into an exterior stair, why older waterproofing assemblies fail, and what a proper rebuild involves in the Bay Area.</description>
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Reading time: about 6 minutes
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          TLDR
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;ul&gt;&#xD;
    &lt;li&gt;
          Exterior stairs fail at the junction where they meet the building, and the damage is rarely where the water got in.
         &lt;/li&gt;&#xD;
    &lt;li&gt;
          As redwood decays it loses the resistance that kept termites out, so a moisture problem becomes an insect problem.
         &lt;/li&gt;&#xD;
    &lt;li&gt;
          Older assemblies used tar paper, which becomes brittle and cracks under movement and load.
         &lt;/li&gt;&#xD;
    &lt;li&gt;
          We rebuild with liquid-applied membranes and pressure-treated framing.
         &lt;/li&gt;&#xD;
  &lt;/ul&gt;&#xD;
  &lt;p&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Exterior stairs come up more than almost any other single piece of work we do. Old stairs give up because the framing is too old and rots away.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          Why stairs specifically
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          An exterior stair is a horizontal surface attached to a vertical wall. That junction, where the stair structure meets the building, is one of the most demanding waterproofing details on a house, and it is under constant load from both water and movement.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          On a hillside property in Oakland or a Victorian in San Francisco, the stair is often the main access to the house rather than a garden feature. When it fails, it has to be dealt with.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          How wood actually fails
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Older Bay Area houses were framed in redwood and Douglas fir rather than pressure-treated lumber. Redwood in particular contains tannins and resins that resist fungus and insects, which is exactly why it was used so widely for decking and exterior framing.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Water changes that. When wood stays wet in a space with no ventilation and no opportunity to dry, fungus begins to grow. Microorganisms break down the cellulose fiber in the timber and the wood starts to decompose, which is a natural process rather than a defect.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          As the wood decays, the natural resistance in redwood dissipates. The tannins and resins that made it unattractive to termites stop doing that job, and the softened wood becomes actively attractive to insects in a way that sound redwood is not. What began as a moisture problem becomes a termite problem.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          At that point the framing stops carrying load. Members go soft, load paths that existed on the original drawings stop existing in the building, and the movement shows up elsewhere: cracks in stucco, cracks in lath and plaster, floors and openings that have shifted out of true.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          The damage is rarely where the water got in
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Water travels. A leak at the top of a stair, or at a roof junction above it, can run down inside a wall and do its damage several feet from where it entered. Travelling water is why a stair that looks sound from the outside can be structurally gone underneath, and why the first visible symptom is often something apparently unrelated, such as a crack in the stucco.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Ventilation is the other half of the problem. Wood that gets wet and then dries is fine. Wood that gets wet in an enclosed space with no airflow stays wet, and staying wet is what starts the process. A great many failed stairs are the result of an assembly that was closed up tight with no way for moisture to leave once it found a way in.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          Why the older assemblies fail
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          The reason these stairs failed is usually not poor workmanship. The cause is almost always that they were built with the materials available at the time.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Under a set of concrete stairs, or behind stucco, the waterproofing barrier was commonly
          &lt;b&gt;
           two-ply felt
          &lt;/b&gt;
          : a tar paper lapped and overlapped to shed water to create something approaching an impermeable layer.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Over decades it becomes brittle. Meanwhile the framing beneath it softens, the weight of the concrete above presses down on framing that is no longer holding its shape, and the paper is stretched. Paper does not stretch. The paper cracks.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Add a seismic region to that. Brittle paper with concrete sitting on top of it does not survive movement well. Once there is a crack, water gets in, and the process that softened the framing accelerates.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;em&gt;
           Johnny and crew rebuilt our front stair (which were falling down.) Excellent craftsmanship and quality. The attention to detail is amazing. Johnny is always communicative and helpful.
          &lt;/em&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;b&gt;
           Jake P.
          &lt;/b&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div&gt;&#xD;
  &lt;img src="https://irp.cdn-website.com/6442fd1d/dms3rep/multi/Terracotta+Stairs+4.jpeg" alt="Brick house entrance with a steep front stairway leading to a covered porch." title=""/&gt;&#xD;
  &lt;span&gt;&#xD;
  &lt;/span&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          What a proper rebuild involves
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          The first step is finding out how bad it is, which means taking the finishes off. Stucco, siding, drywall or lath and plaster all come off until the framing and the sheathing are visible and the scope is real rather than estimated.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          When the picture is not clear at the outset, we work on a time and materials basis with a budget outline and agreed contingencies, so you know what is covered and at what point we come back to you.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          When existing framing has failed,
          &lt;b&gt;
           shoring
          &lt;/b&gt;
          goes in first. Shoring is temporary structural support that picks up the loads the failed framing was carrying, which allows the rotted material to be removed safely and replaced to match the existing layout so that the finishes still land where they should.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          Material choice
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          What goes back in depends on exposure.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Anywhere with a risk of damp or poor ventilation, anything on a horizontal exterior surface, and anything in contact with the ground gets pressure-treated lumber. Under a stair, that means pressure-treated sheathing where the stair meets the exterior facade, and pressure-treated framing for the stair itself.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Ordinary dry interior framing conditions, with habitable space inside and a regular wall assembly, get Douglas fir, which is standard framing material.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          The waterproofing itself
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          We rebuild with
          &lt;b&gt;
           liquid-applied membranes
          &lt;/b&gt;
          rather than lapped paper. Under stairs and on foundation walls we use TREMproof 250GC, applied directly onto the framing members so that it sheds water rather than relying on overlaps to do it. The membrane returns up the exterior facade over the sheathing by a minimum of 6 inches, and the new exterior barrier laps down over it.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          When a client wants belt and suspenders, we also use a liquid-applied barrier on the exterior facade sheathing. PROSOCO R-Guard Cat 5 is the premium option here. What you get is a seamless elastomeric membrane rather than a lapped one, which means the performance no longer depends on getting every overlap and every flashing detail exactly right.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          The material cost difference across the front of a house is on the order of a thousand dollars.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          Permits
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          When the work is a genuine in-kind repair, replacing something that already exists with the same thing in the same place, a repair permit is usually available and moves faster than a full permit set. When a repair becomes a change, whether that is a different size opening, a different structural arrangement or additional square footage, the full route applies.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div&gt;&#xD;
  &lt;img src="https://irp.cdn-website.com/6442fd1d/dms3rep/multi/17th+St+Stair+3.jpg" alt="White front steps with porch railings beside a beige house and sidewalk in a residential area" title=""/&gt;&#xD;
  &lt;span&gt;&#xD;
  &lt;/span&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          When a rebuild becomes an upgrade
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          A failed stair is often the moment a client decides to improve it rather than replace it like for like, since the demolition is happening either way.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          On a Craftsman house in Piedmont with brick stairs suffering termite damage, we did the demolition and repair, rebuilt the structural ramp that carries a masonry stair, installed new waterproofing, and a stonemason set the new brick to a pattern the client chose. Stucco, paint and a sealer followed.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          On a Victorian in the Mission District with a failed original stair, we rebuilt on pressure-treated framing with exterior grade cedar newel posts, MDO exterior grade plywood casing and 1x12 bullnosed laminated Alaskan yellow cedar treads. The rail cap is profile cedar made up from four separate parts, which lets the assembly be adjusted to the run of the stair. Profiles came from lumber stock, checked against what Beronio Lumber held, with the client approving the options before anything was milled.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Work on a San Francisco Victorian carries planning review as well, because the property is protected and the work has to be in keeping with the existing architecture.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Rebuilding in materials rated for the exposure they will actually get is the difference between a stair that lasts decades and one replaced twice in the same period. Where existing cedar can be saved we save it, and what cannot be reused is replaced through a certified sustainable supplier in Berkeley.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/6442fd1d/dms3rep/multi/17th+St+Stair+5.jpg" length="534765" type="image/jpeg" />
      <pubDate>Mon, 20 Jul 2026 12:00:00 GMT</pubDate>
      <guid>https://www.oakironbuildworks.com/waterproofing-exterior-stairs</guid>
      <g-custom:tags type="string">Restoration,Exteriors &amp; Restoration,Waterproofing</g-custom:tags>
      <media:content medium="image" url="https://irp.cdn-website.com/6442fd1d/dms3rep/multi/17th+St+Stair+5.jpg">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/6442fd1d/dms3rep/multi/17th+St+Stair+5.jpg">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>What Oakland’s Pre-Approved ADU Plans Actually Save You</title>
      <link>https://www.oakironbuildworks.com/oakland-pre-approved-adu-plans</link>
      <description>What Oakland’s pre-approved ADU plans save you, what they do not, and how to work out whether the standard route suits your lot.</description>
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Reading time: about 5 minutes
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          TLDR
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;ul&gt;&#xD;
    &lt;li&gt;
          Pre-approved plans are pre-approved, not pre-permitted. You still need a site-specific permit for your property.
         &lt;/li&gt;&#xD;
    &lt;li&gt;
          What they save is review time and design fees, because most of the design review is already done.
         &lt;/li&gt;&#xD;
    &lt;li&gt;
          What they do not cover is the site, and the site is where most of the cost variation on an ADU lives.
         &lt;/li&gt;&#xD;
    &lt;li&gt;
          Modifying a pre-approved plan gives up most of the advantage. If you want changes, you probably want a custom unit.
         &lt;/li&gt;&#xD;
  &lt;/ul&gt;&#xD;
  &lt;p&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          If you have space at the back of a property in Oakland and you have been thinking about an accessory dwelling unit, you will have come across the phrase pre-approved plans. The city publishes a library of them, and using one is often described as the fast route.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          Three ways to get an ADU
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          The first is a
          &lt;b&gt;
           pre-approved plan
          &lt;/b&gt;
          . You choose a design from the city’s library, one that fits your lot and your requirements, and build it.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          The second is a
          &lt;b&gt;
           prefabricated unit
          &lt;/b&gt;
          . A manufacturer supplies drawings, those drawings go to the city for approval, and once approved your contractor prepares the site and the unit arrives assembled to be set onto the foundation with the utility connections already run to meet it.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          The third is
          &lt;b&gt;
           fully custom
          &lt;/b&gt;
          , which means a building designed for you and your lot from the beginning.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          What pre-approved actually means
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          A pre-approved plan is a design that has already been reviewed against the California Building Code and against local zoning. Oakland offers these as off-the-shelf plans for properties with single-family or multi-family homes.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          The important distinction is that pre-approved does not mean pre-permitted. You still need a site-specific permit for your property. What has been done in advance is most of the design review, which is a significant portion of the work but not all of it.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          The city still needs to see how the unit sits on your particular lot, how it relates to setbacks and to the primary dwelling, where the utilities come from and where they connect, and how the site drains.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          What it saves
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          The saving is in time, and specifically in review time. Because the design itself has already been assessed for code and zoning compliance, plan review moves faster than it would for a custom set of drawings that a reviewer is seeing for the first time.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          There is also a saving in design fees. You are not paying an architect to design a building from scratch, and you are not paying for the revision cycles that a first review usually produces.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          California law now requires cities to act on a complete ADU application within 60 days, which has made the permitting side of an ADU considerably more predictable than it used to be. An incomplete application does not start the clock.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          What it does not save
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          A pre-approved plan covers the building. The plan does not cover the site, and the site is where most of the cost variation on an ADU lives.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          When we come out to look at a property, we are working out where the electrical service is, where the sewer line runs, where the water comes in, and how far the proposed unit sits from all three. Every foot of that distance is trenching, and trenching through a mature garden with restricted access is a different proposition from trenching across open ground.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          We are also looking at access. A lot a small excavator can reach is straightforward. A lot where every yard of concrete and every stick of lumber moves by hand through a side gate is not.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Then there is grade and drainage, and what the ground itself will require underneath the foundation.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Utility connections deserve their own mention. A new dwelling needs power, water, sewer and usually gas, and whether your existing service has the capacity to carry a second unit is not something you can tell by looking.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          Garage conversions and junior units
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          A detached unit in the garden is not the only route. Two others come up regularly.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          A
          &lt;b&gt;
           garage conversion
          &lt;/b&gt;
          turns space you already have into living space. The structure, the roof and usually the foundation already exist, so the work is closer to a remodel than a new build. What tends to drive the cost is bringing an unconditioned space up to habitable standard: insulation, egress, fire separation, heating, and often a new floor slab or floor structure. Utility runs are usually shorter, because you are already attached to the house.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          A
          &lt;b&gt;
           junior accessory dwelling unit
          &lt;/b&gt;
          , or JADU, is a small unit created within the existing footprint of the house, typically with its own entrance. Most Oakland single-family properties can have one detached ADU and one JADU on the same lot, which is worth knowing if you are weighing up whether to build one larger unit or two smaller ones.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          The modification trap
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          The most common way people lose the benefit of a pre-approved plan is by changing it.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          The saving exists because the design has already been reviewed. Modify the design and that review no longer applies to what you are proposing, which puts you back into a review process without the benefit of having started with a custom design in the first place.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          If you find yourself wanting to move the bathroom or change the window arrangement on a pre-approved plan, you probably want a custom unit.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div&gt;&#xD;
  &lt;img src="https://irp.cdn-website.com/6442fd1d/dms3rep/multi/Crocker+Highlands+Oakland+Remodel+3.jpg" alt="Modern bathroom with patterned shower curtain, white tub, and wood vanity beside a window" title=""/&gt;&#xD;
  &lt;span&gt;&#xD;
  &lt;/span&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          When custom is the right answer
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          We are happy to accommodate specific requests for how a space should work.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          A studio with a work space that is genuinely separate from the living area. A room laid out for yoga or for practice.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          How to decide
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          If you want additional living space at the back of the property, and you are relatively relaxed about exactly what it looks like, a pre-approved plan is very likely the right route and will get you there faster and for less.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          If you have a clear picture of what the space needs to do, custom is worth the additional time and cost.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          What we do
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          If the pre-approved route suits your property, we can obtain the plans on your behalf. Plenty of people call us knowing only that they want an ADU and are not sure what the options are or where to start.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          From there we handle the site assessment, structural engineering, permitting, foundations, utility connections and the build. If a prefabricated unit is the right answer, we prepare the site and coordinate the set. If it is custom, we bring in an architect and take the design through from the beginning.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;&lt;div data-rss-type="text"&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          An ADU adds a home on land that is already developed and already served by utilities, which is among the least resource intensive ways to add housing.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/6442fd1d/dms3rep/multi/Surrey+St+San+Francisco+Remodel+9.png" length="4482577" type="image/png" />
      <pubDate>Mon, 06 Jul 2026 01:17:57 GMT</pubDate>
      <guid>https://www.oakironbuildworks.com/oakland-pre-approved-adu-plans</guid>
      <g-custom:tags type="string">ADUs &amp; Additions,ADUs,Permitting</g-custom:tags>
      <media:content medium="image" url="https://irp.cdn-website.com/6442fd1d/dms3rep/multi/Surrey+St+San+Francisco+Remodel+9.png">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/6442fd1d/dms3rep/multi/Surrey+St+San+Francisco+Remodel+9.png">
        <media:description>main image</media:description>
      </media:content>
    </item>
  </channel>
</rss>
